Installing laboratory casework requires far more than standard millwork practices. It demands strict adherence to safety standards, chemical resistance requirements, mechanical coordination, and precise tolerances. Our installation process ensures performance, durability, and compliance in high-demand environments such as research labs, healthcare facilities, educational institutions, and industrial settings.
Our Process for Lab Work Installations
Pre-Construction Review & Coordination
Scope Verification
-
Review architectural, MEP, and shop drawings
-
Confirm casework types (wood, metal, phenolic resin, stainless steel)
-
Identify utility requirements (gas, water, vacuum, electrical, data)
Site Coordination
-
Verify wall backing, blocking, and floor conditions
-
Confirm rough-in locations and dimensions
-
Coordinate with GC, plumbing, electrical, and mechanical trades
Compliance Check
-
ADA requirements
-
Seismic anchoring (if required)
-
Institutional or healthcare regulations
.webp)
.webp)
Site Preparation
Field Verification
-
Measure and confirm dimensions against shop drawings
-
Verify slab levelness and wall plumb
Protection & Staging
-
Protect finished floors and adjacent surfaces
-
Stage materials in controlled, clean areas
-
Maintain clean environment standards for lab conditions
Base & Fixed Casework Installation
Anchoring & Leveling
-
Set base cabinets using laser levels for precision alignment
-
Shim and anchor securely to wall backing or structural supports
-
Maintain tight tolerances for seamless countertop integration
Seismic & Structural Compliance
-
Install required bracing and anchoring systems
-
Follow engineered fastening specifications
Service Integration
-
Allow access panels for plumbing and electrical
-
Coordinate penetrations as required
.webp)
.webp)
Countertop & Work Surface Installation
Material Handling
-
Epoxy resin
-
Phenolic resin
-
Stainless steel
-
Solid surface or specialty chemical-resistant tops
Precision Fit
-
Field scribe to walls
-
Seam alignment and chemical-resistant sealing
-
Sink and fixture cutouts per specification
Upper Casework & Specialty Components
Wall Cabinets & Shelving
-
Secure to structural backing
-
Ensure level alignment with base units
Specialty Equipment Integration
-
Fume hood casework coordination
-
Overhead service carriers
-
Reagent racks and adjustable shelving
.webp)
.webp)
Final Adjustments, Quality Control & Turnover
Alignment & Hardware Adjustment
-
Door and drawer calibration
-
Soft-close and specialty hardware verification
Quality Assurance
-
Joint inspection with GC
-
Punch list completion
-
Surface cleaning and protection removal
Project Closeout
-
Final documentation
-
Warranty information
-
Client sign-off
Why Laboratory Casework Requires Specialized Installation
.png)
Chemical resistance awareness
.png)
Strict dimensional accuracy
.png)
Utility coordination expertise

Clean installation practices
.png)